top of page

Delegating Technical Work: The "I'll Just Do It Myself" Problem

Writer: Diana San Diego
Diana San Diego
Nov 13
4 min read
Technical professional reviewing drawings and notes while planning how to delegate technical work

“I’ll just do it myself.”


I’ve said this plenty of times over the course of my career, especially when things were busy.


When you know how to do something and can knock it out quickly, delegating technical work can feel like the least efficient option. Stopping to explain the task to someone else may take longer than simply doing it yourself.


And honestly, sometimes it is. If I can finish something in 30 minutes, but explaining it to someone else will take an hour, doing it myself is faster.


But that's just for today. The problem starts when I make that same decision tomorrow. And next week. And next month.


Pretty soon, I’ve become permanently responsible for something simply because I was the fastest person to do it in the beginning.


Being Good at Something Can Become a Trap


I’ve watched versions of this happen throughout my career in the glass industry.


The person who’s good at takeoffs keeps getting the takeoffs. The person who knows how something should be detailed becomes the person everyone goes to when there’s a question on the drawings. The estimator who knows a product line inside and out gets pulled into the quotes that are a little more complicated.


And it makes sense. The work keeps going to that person because they’re good at it and everyone trusts them.


It works until there’s more work than that person can reasonably handle. Then we call it a capacity problem.


Sometimes it is. But sometimes we’ve unintentionally built a process around one person.


The Calculation We Usually Make


The normal calculation is pretty simple:


"How long will it take me to do this myself?" versus "How long will it take me to teach someone else?"


If that’s the calculation, “I’ll just do it myself” wins a lot.


The multiplier idea I took from Rory Vaden’s TEDxtalk "How To Multiply Your Time" made me look at that calculation differently. Instead of only thinking about how much time it takes to transfer the work today, I started thinking about how much of my time that work will continue to require in the future.


That changes the question:


"If I invest the time to teach someone now, how much of my time could I get back later?"


For a recurring task, that can be a much more useful way to look at it.


Don’t Just Hand It Off


There’s an important catch.


I don’t think the answer is to take everything off an experienced person’s desk and simply hand it to somebody else.


Before we decide who should do the work, we need to look more closely at what the work actually involves.


That’s why we developed what we call the Technical Capacity Funnel™ as part of the Capacity Multiplier. It gives us six questions to work through:


REMOVE: Does this work need to happen?


AUTOMATE: Can technology reliably handle any of it?


SEPARATE: What requires judgment and what’s repeatable?


DOCUMENT: Can the repeatable portion become a defined process?


TRANSFER: Can someone else become proficient at it?


REVIEW: Where should experienced people stay involved?


For me, SEPARATE may be the most important step.


One thing I’ve learned from working around technical teams is that we tend to talk about jobs and workflows as if they’re one big thing: estimating, takeoffs, drafting, quoting, project management.


But when you break the work apart, you start to see that not every piece of an “experienced” job necessarily requires the same amount of experience.


Take Estimating as an Example


I’ve spent enough time around estimating in the glass industry to know that asking “Can we delegate estimating?” is the wrong question.


Estimating isn’t one task.


There are parts that require product knowledge, experience and judgment. There are also parts of the workflow that follow an established process.


An unusual condition on the drawings may absolutely need an experienced estimator to determine how to approach it. A difficult scope question may need someone who understands the product and knows what to look for.


That’s exactly where I want their experience.


But that doesn’t necessarily mean the estimator also needs to personally perform every material takeoff surrounding those decisions.


The same thinking can apply to drafting.  A senior person may need to determine how something should be handled, identify an exception or review the final work. That doesn’t automatically mean they need to personally start every drafting request or incorporate every redline.  


The question isn’t whether we can remove the experienced person. It’s where we really need their experience.


If another qualified technical person can learn to perform defined portions of the work consistently, the experienced estimator or project manager can stay involved where their judgment matters without having to personally produce everything.


That’s the opportunity I find interesting.


One Task Is Enough to Start


You don’t have to rethink an entire department to start looking at work differently.


Think of one recurring technical task you routinely tell yourself is easier to do yourself.

Don’t immediately hand it to somebody else. Run it through the Funnel and look at the work first.


You may come out the other side and decide, "Nope. I really am the person who should do this."


That’s fine. But you may also realize that something has been sitting on your plate for years simply because you were the person who knew how to do it.


And if part of that work can be documented, taught and performed consistently by someone else, you haven’t just delegated a task.


You’ve started building another layer of capability around your experienced people.


 

 
 
 

Comments


bottom of page